INDIVIDUAL FACILITIES AND SELECTED SOURCES
Below is basic information about individual facilities in our database and selected sources we've drawn on to support the analysis. To navigate to other sites, use the search page.
LG Cathode Facility (Phase 2)
LG
Clarksville, TN, USA
-87.2421642, 36.59810687
The Big Green Machine Site ID: 93B
Additional Information:
Sector: Batteries
Activity: Manufacturing
Product: Battery Cell Components
Project Announcement Date: 11/21/2022
Target for Starting Production: 2027
Date Commercial Production Started:
Announced Post Inflation Reduction Act: Yes
Target Annual Production: 525000 # EVs supported by annual production
Operating Status: Planned
Capital Investment: $1600 million
Congressional District: TN7
Government Subsidies:
We currently have no government subsidies tracked for this site.
Selected Sources:
“In a huge leap, LG Chem begins building the US’ largest cathode factory”, Can Emir, Interesting Engineering, 28 Dec 2023. 🔗
Tracked Expansions, Acquisitions, or Related Sites:
This site has 1 major expansion(s).
Those expansion(s) are tracked below:
Site 449A: Maxeon Ensenada Mexico Factory