top of page

INDIVIDUAL FACILITIES AND SELECTED SOURCES
Below is basic information about individual facilities in our database and selected sources we've drawn on to support the analysis.  To navigate to other sites, use the search page.

Company logo

Waaree Solar Factory

Waaree Energies

Brookshire, TX, USA

-95.9293235, 29.7514931

The Big Green Machine Site ID: 479

Additional Information:

Sector: Solar

Activity: Manufacturing

Product: Solar Cells


Project Announcement Date: 12/21/2023

Target for Starting Production: 2024

Date Commercial Production Started: 1/23/2025

Announced Post Inflation Reduction Act: Yes


Target Annual Production: 3 GW

Operating Status: Operating


Target Jobs: 1500

Current Jobs: 0

Capital Investment: $1000 million

Congressional District: Republican

Government Subsidies:

We currently have no government subsidies tracked for this site.

Selected Sources:

“Waaree to open 3-GW solar panel manufacturing factory in Texas in 2024”, Kelly Pickerel, Solar Power World, 21 Dec 2023. 🔗


“India’s Waaree Energies will build a 5 GW solar factory in Texas”, Michelle Lewis, Electrek, 21 Dec 2023. 🔗


“Waaree starts solar module production at its USA facility”, Uma Gupta, pv magazine India, 20 Dec 2024. 🔗


“Waaree Solar Americas starts 1.6 GW solar module production in Texas”, ETEnergyworld.com, 23 Jan 2025. 🔗


“Waaree Solar Americas Begins U.S. Domestic Manufacturing of Solar PV Modules!”, Instagram, No Date. 🔗


Tracked Expansions, Acquisitions, or Related Sites:

We currently have no related projects tracked for this site.

This website, dashboard, and dataset are maintained by Jay Turner and student researchers in the Environmental Studies Department at Wellesley College. It is updated at least monthly. The data presented are compiled from publicly available sources. Summary statistics are incomplete and omit data from sites where publicly available information (regarding capital investments, employment levels, etc.) is unavailable. While we make every effort to ensure the information presented here is accurate, the information should be treated as estimates. We assume no responsibility or liability for any errors or omissions. The information contained in this site is provided on an "as is" basis with no guarantees of completeness, accuracy, or usefulness. 
The data on this site was last updated on March 19, 2025.

Wellesley College Logo
bottom of page