INDIVIDUAL FACILITIES AND SELECTED SOURCES
Below is basic information about individual facilities in our database and selected sources we've drawn on to support the analysis. To navigate to other sites, use the search page.
TPI Composites Blade Facility (Reopening)
TPI Composites, General Electric
Newton , IA, USA
-93.0214996, 41.7303619
The Big Green Machine Site ID: 313B
Additional Information:
Sector: Wind
Activity: Manufacturing
Product: Blade
Project Announcement Date: 11/3/2022
Target for Starting Production: 2025
Date Commercial Production Started:
Announced Post Inflation Reduction Act: Yes
Operating Status: Planned
Target Jobs: 320
Current Jobs: 0
Capital Investment: $3.2 million
Congressional District: IA1
Government Subsidies:
Local/State: $0.5 million
Selected Sources:
“TPI Returning To Newton Thanks To Inflation Reduction Act”, Nikoel Hytrek, Iowa Starting Line, 02 Dec 2022. 🔗
“Wind turbine blade production to resume at Iowa plant”, Marcus McIntosh, KCCI, 04 Nov 2022. 🔗
“Wind blade manufacturer TPI plans to reopen Newton plant. But new jobs might be months away”, Donnelle Eller, The Des Moines Register, No Date. 🔗
“Newton Mayor Hopes Wind Blade Plant Reopens Soon”, KNIA KRLS Radio - The One to Count On, 13 Aug 2024. 🔗
“TPI awarded state loan to aid restart of operations at Newton wind blade plant”, Mike Mendenhall, Business Record, 17 Jan 2025. 🔗
“US blade maker TPI Composites set to re-open Iowa factory to support GE Vernova”, Ros Davidson, Windpower Monthly, 26 Feb 2025. 🔗
Tracked Expansions, Acquisitions, or Related Sites:
This site has 1 major expansion(s).
Those expansion(s) are tracked below:
Site 313A: TPI Composites Blade Facility (Closed)