top of page
INDIVIDUAL FACILITIES AND SELECTED SOURCES
Below is basic information about individual facilities in our database and selected sources we've drawn on to support the analysis. To navigate to other sites, use the search page.
Battery Electrode Manufacturing Facility
Enevate; JR ES
USA
The Big Green Machine Site ID: 289
Additional Information:
Sector: Batteries
Activity: Manufacturing
Product: Battery Cell Components
Project Announcement Date: 7/24/2023
Date Commercial Production Started:
Announced Post Inflation Reduction Act: Yes
Target Annual Production: 6 GWh
Operating Status: Rumored
Government Subsidies:
We currently have no government subsidies tracked for this site.
Selected Sources:
Tracked Expansions, Acquisitions, or Related Sites:
This site has 2 major expansion(s).
Those expansion(s) are tracked below:
Site 287B: Magna Frame And Battery Enclosures Factory
Site 287C: Magna Seating Factories
bottom of page